Built-in wardrobes: costs and options
Sketch how you use a wardrobe before choosing doors. Allow room for long hanging, folded clothes, baskets and drawers to open clear of sliding-door overlaps.
What to include in the scope
Get a drawing with internal depths, module widths and hardware. Compare hinged and sliding doors against the room clearance. Include wall scribing, skirting removal, mirror panels, demolition and patching as separate items.
Arrange safe anchoring and check for concealed services before drilling. Electrical changes for integrated lighting require a licensed electrician.
Australian Government YourHome — Preliminary research. Reviewed 12 November 2026. This reference provides planning context.
Build your wardrobe budget
Enter low and high all-in estimates per wardrobe from your chosen layout. Add a one-off allowance only for work not already included.
Put these questions on every quote
- Is the quote based on a site measure, and will the installer account for out-of-square walls and a sloping floor?
- Who removes the old wardrobe and disposes of the waste?
- Are wall repairs, skirting changes, painting and floor repairs included?
- How will it be anchored, and who checks concealed services?
- Which products and finishes are specified, and what is the warranty on workmanship?
- What deposit, lead time and approval process apply before manufacture?
Confirm safe anchoring and concealed services with the installer. Integrated lighting or moved power points require appropriately licensed electrical work.
Compare the same wardrobe
Give each supplier the same drawing and inclusion list, then record exclusions, warranty and timing in the quote tool. Keep a copy of the approved design alongside your written quote.
Compare quotes ↗