Made for Australian homesFree planning tools • No signup required
Energy & climate·Project guide

Heat pump hot water: costs and options

Start with household hot-water use and the space available for a tank and outdoor equipment. Compare integrated and split heat pumps and ask about operating noise near bedrooms or neighbouring properties.

Interactive worksheet · Enter your own rates · No signup

What to include in the scope

Budget the installed system separately from slab or bracket work, valves, electrical supply and removal of the old unit. Ask for the full GST-inclusive price and a separate line for any incentive that depends on eligibility.

Plumbing and drainage work may require a licensed plumber. Check the rules for your state or territory and whether permits are needed. Electrical work requires licensed personnel.

Planning reference

Australian Government energy.gov.au — Hot water systems. Reviewed 12 November 2026. This reference provides planning context.

YOUR PROJECT ESTIMATE

Build your budget

Adjust the quantities and unit rates. This is a planning tool, not an installer quote.

Your own estimate · last reviewed 28 October 2026
Basis for the example

Use local itemised quotes as the starting rates. Freight, labour availability and minimum call-out charges can change the total by location. Enter GST-inclusive rates where available and list removal, disposal and access separately when excluded.

BETTER QUESTIONS

Ask before you accept a quote.

  • Who completes the plumbing and electrical work, when will we have hot water again, and which parts and labour are covered by the warranty?
  • Is GST included, and is the price fixed or estimated?
  • Are removal, disposal, access and making-good included?
  • What changes would trigger extra costs, and who approves them?
  • What is the warranty on products and workmanship?
Safety and licensing

Plumbing and drainage work may require a licensed plumber. Check the rules for your state or territory and whether permits are needed. Electrical work requires licensed personnel.

THE NEXT STEP

Compare quotes against the same scope

Record itemised inclusions from at least two quotes, then evaluate differences in quality, warranty, timing and exclusions.

Compare quotes ↗