Made for Australian homesFree planning tools • No signup required
Electrical & lighting·2026 guide

Replace power points: costs and options

A like-for-like outlet replacement and a new socket location need different allowances. Show the electrician each location and flag heat damage, loose plates or repeated tripping so the quote can cover investigation.

◷ 3-minute planning tool◈ Australia-wide guidance✓ Free, no signup

What to include in the scope

Ask a licensed electrician to price the first outlet and any extra outlets in the same visit separately. Compare the same outlet type and make clear whether wall repair or circuit work is excluded.

Fixed electrical installations require a properly licensed electrician. Do not undertake DIY work on power points, switches, wiring or hardwired equipment.

Planning reference

ACCC — Contracts. Reviewed 12 November 2026. This reference provides planning context.

YOUR PROJECT ESTIMATE

Build your budget

Adjust the quantities and unit rates. This is a planning tool, not an installer quote.

Source checked · last reviewed 28 October 2026
Source and scope · checked 28 October 2026

Standard double outlet, same position: first outlet includes attendance; each extra outlet uses the incremental rate on the same visit. Source prices include GST. Fault repairs and circuit changes are separate.

Yakka Labour 2026: single like-for-like double outlet including attendance. ↗

These are general Australia-wide starting figures from a dated cost guide, not a quote. Confirm local scope, labour, GST and any call-out charges before relying on the estimate.

MAKE AN INFORMED CHOICE

What a fair electrical quote should spell out

Replacement versus relocation

A like-for-like replacement of an accessible existing outlet is different from adding an outlet or moving one. Ask the electrician to price these as separate scopes.

Batching can affect the total

The published starter rate describes a particular single-outlet service. If multiple outlets are done at one appointment, a site attendance charge should not automatically be multiplied across every replacement.

Safe completion

Confirm the contractor is appropriately licensed and the quote includes any required testing and making-good of disturbed finishes.

BETTER QUESTIONS

Ask before you accept a quote.

  • What does the attendance charge cover, what could trigger additional work, and what documentation will I receive?
  • Is GST included, and is the price fixed or estimated?
  • Are removal, disposal, access and making-good included?
  • What changes would trigger extra costs, and who approves them?
  • What is the warranty on products and workmanship?
Safety and licensing

Fixed electrical installations require a properly licensed electrician. Do not undertake DIY work on power points, switches, wiring or hardwired equipment.

THE NEXT STEP

Compare quotes against the same scope

Record itemised inclusions from at least two quotes, then evaluate differences in quality, warranty, timing and exclusions.

Compare quotes ↗