Replace fencing: costs and options
Confirm the boundary and discuss the scope with adjoining owners before ordering materials. A straight, level run can be a very different quote from a stepped fence with a retaining wall or gates.
What to include in the scope
Measure each run in metres, noting height, slope, corners and gate openings. Compare timber paling and steel panels with the same removal and post specification. Ask for separate gate, disposal and retaining costs.
Australian Government YourHome — Preliminary research. Reviewed 12 November 2026. This reference provides planning context.
Build your budget
Adjust the quantities and unit rates. This is a planning tool, not an installer quote.
Use local itemised quotes as the starting rates. Freight, labour availability and minimum call-out charges can change the total by location. Enter GST-inclusive rates where available and list removal, disposal and access separately when excluded.
Ask before you accept a quote.
- How will you handle changes in level and existing footings, and is clearing vegetation included in the price?
- Is GST included, and is the price fixed or estimated?
- Are removal, disposal, access and making-good included?
- What changes would trigger extra costs, and who approves them?
- What is the warranty on products and workmanship?
Compare quotes against the same scope
Record itemised inclusions from at least two quotes, then evaluate differences in quality, warranty, timing and exclusions.
Compare quotes ↗