Made for Australian homesFree planning tools • No signup required
Outdoor projects·Project guide

Timber or composite deck: costs and options

Compare a new deck with repairing the existing substructure. Decking boards are only one cost. Posts, bearers, joists, connections, stairs and balustrades can change the scope considerably.

Interactive worksheet · Enter your own rates · No signup

What to include in the scope

Measure deck area and list stairs and balustrades separately. Compare treated timber and hardwood against the finish, fixings and ongoing maintenance. Check local approval requirements and ask about access for footing work and material delivery.

Planning reference

Australian Government YourHome — Preliminary research. Reviewed 12 November 2026. This reference provides planning context.

YOUR PROJECT ESTIMATE

Build your budget

Adjust the quantities and unit rates. This is a planning tool, not an installer quote.

Your own estimate · last reviewed 28 October 2026
Basis for the example

Use local itemised quotes as the starting rates. Freight, labour availability and minimum call-out charges can change the total by location. Enter GST-inclusive rates where available and list removal, disposal and access separately when excluded.

BETTER QUESTIONS

Ask before you accept a quote.

  • Which timber and fixings are specified, what is allowed for excavation or difficult access, and who arranges any approvals?
  • Is GST included, and is the price fixed or estimated?
  • Are removal, disposal, access and making-good included?
  • What changes would trigger extra costs, and who approves them?
  • What is the warranty on products and workmanship?
THE NEXT STEP

Compare quotes against the same scope

Record itemised inclusions from at least two quotes, then evaluate differences in quality, warranty, timing and exclusions.

Compare quotes ↗