Switchboard upgrade: costs and options

Understand costs and checks before replacing an old domestic switchboard.

◷ 3-minute planning tool◈ Australia-wide guidance✓ Free, no signup
BEFORE YOU BEGIN

What shapes the cost?

Number of circuits, switch location, safety devices and existing faults.

Compare identical scopes before choosing a contractor. Ask which preparatory work, materials, disposal, GST and site access requirements the quote includes.

YOUR PROJECT ESTIMATE

Build your budget

Adjust the quantities and unit rates. This is a planning tool, not an installer quote.

Source checked · last reviewed 28 October 2026
Source and scope · checked 28 October 2026

Whole switchboard job, based on the middle half of marketplace quotes. Confirm the included circuits, testing, repairs, attendance and GST before using this as your project budget.

Service.com.au 2026: typical quoted switchboard upgrade range. ↗

These are general Australia-wide starting figures from a dated cost guide, not a quote. Confirm local scope, labour, GST and any call-out charges before relying on the estimate.

MAKE AN INFORMED CHOICE

Plan for more than the enclosure

Check the reasons for upgrading

Capacity constraints, safety-switch requirements and condition of existing wiring may each drive different scopes. A quote should specify what has been assessed.

Check inclusions

Confirm the supply authority requirements, testing, labelling and any meter or mains work. Larger issues can make a published starting range unsuitable.

Ask for written scope

A licensed electrician should identify whether inspection or compliance issues could require additional work before the job begins.

BETTER QUESTIONS

Ask before you accept a quote.

  • Does the scope include testing, compliance paperwork and supply coordination?
  • Is GST included, and is the price fixed or estimated?
  • Are removal, disposal, access and making-good included?
  • What changes would trigger extra costs, and who approves them?
  • What is the warranty on products and workmanship?
Safety and licensing

Fixed electrical installations require a properly licensed electrician. Do not undertake DIY work on power points, switches, wiring or hardwired equipment.

THE NEXT STEP

Compare the same job, not just the price.

Record itemised inclusions from at least two quotes, then evaluate differences in quality, warranty, timing and exclusions.

Compare quotes ↗